A Bill of Quantities is the single most crucial document in any interior agreement — and the one majority of house owners skim past. It isn’t just a cost list; it’s the accurate record of what materials, brands, quantities and rates you’ve agreed to. Learning to read an interior bill of quantities properly before signing is the best protection against disputes later. At Walls and Dreams, we walk every client through their BOQ line by line before asking for a signature.
What a BOQ Actually Is
A BOQ breaks a lump-sum quote into individual, measurable items — plywood grade and quantity, laminate brand, running feet of wardrobe shutters, electrical points, paint litres, and so on. A proper interior boq format should let you verify exactly what you’re paying for, item by item, rather than trusting a single bottom-line number.
What a Proper BOQ Should Include
A solid home interior boq sample typically has these columns and details:
- Item description specific (e.g., “18mm BWP plywood wardrobe shutter” not just “wardrobe”)
- Brand name for plywood, laminate, hardware, paint, electrical fittings
- Unit of measurement sq. ft., running ft., per point, per unit
- Quantity measured against actual site dimensions, not estimates
- Rate per unit
- Total amount per line item
- Taxes GST shown separately, not buried in the total
In case any of these aren’t available or unclear, ask for justification before signing.
A BOQ Checklist Before You Sign
Use this boq checklist interior work homeowners should run through:
- Are plywood and laminate brands named specifically, not just “branded”?
- Are electrical points itemized separately, not lumped as “electrical work”?
- Are quantities based on actual site measurement, not rough estimates?
- Is painting quantified by area (sq ft) with the count of coats specified?
- Are exclusions cleanly written at the end of the document?
- Is GST shown as a separate line, not hidden in unit rates?
- Does the BOQ match the design drawings in quantity and layout?
- Is hardware (hinges, channels, locks) brand and kind specified?
Common Red Flags in a Vague Quote
Be cautious with any interior quotation format that:
- Uses vague terms like “as required” instead of specific quantities
- Lists a single lump sum for “carpentry work” without item breakdown
- Doesn’t name material brands or grades
- Has no separate exclusions section
- Doesn’t match the number of rooms/areas in your actual home
These patterns often lead to “extra charges” mid-project that weren’t disclosed upfront.
How to Compare Two BOQs Fairly
- Line up similar elements side-by-side (plywood grade to plywood grade)
- Normalize prices to the same unit (per sq ft vs per running ft can be confusing)
- Assess if one quote is missing components the other includes (that’s mostly why it seems cheaper)
- Query both contractors to clarify any vague line prior to finalizing
A lower total is meaningless if it’s missing electrical points or has lower-grade plywood than the other quote.
Why This Protects You Legally, Too
A detailed BOQ becomes part of your contract. If a dispute arises later — wrong material used, missing item, quantity mismatch — the BOQ is your primary reference point. A vague quote gives you almost nothing to stand on if something goes wrong.
Conclusion
A detailed BOQ is what turns a vague promise into an enforceable agreement. Taking the time to read it line by line — brands, quantities, units, and exclusions — is the most effective way to protect yourself from cost overruns and quality downgrades later.
Every client working with Walls and Dreams receives an itemized BOQ with named brands, measured quantities, and a clear exclusions section — reviewed together before any advance is collected.
FAQs
What is the distinction between a quotation and a BOQ?
A quotation mostly represents lump-sum pricing whereas a BOQ breaks the same work into separate items with quantities, brands and prices — giving you much more information to validate.
Should I trust a contractor who won’t provide a comprehensive BOQ?
Be cautious. A refusal to itemize costs is a common precursor to scope disputes and hidden charges later.
What’s the most commonly hidden cost in vague BOQs?
Hardware quality (hinges, channels, locks) is frequently downgraded silently when not named specifically in the BOQ.
Do Walls and Dreams share the BOQ before taking an advance?
Yes, the itemized BOQ is reviewed and finalized with the client before any payment is collected.
Can a BOQ change after the contract is signed?
Only through a documented change order — any addition or modification should be recorded in writing with updated pricing, not verbally agreed.